|
Data in this release
Data for the first 90 sols of the Phoenix mission
were released on February 23, 2009. Additional data will be released in
according to the mission archive plan.
| Release |
Data acquisition |
Public release |
| 1 |
sols 0-30 |
Dec 23, 2008 |
| 2 |
sols 31-90 |
Feb 23, 2009 |
| 3 |
sols 91-152 |
Apr 29, 2009 |
Most of the released data are in the Notebook. Some data were
not released in time to be included in this Notebook release, but are available
from the Planetary Data System (PDS). Refer to the table below.
| Data in the Notebook, integrated in sol summaries and the search tools |
|
|
INSTRUMENT |
DATA SET |
MECA Atomic Force Microscope (AFM) |
All data sets |
MECA Thermal and
Electrical Conductivity Probe (TECP) |
Raw time series |
MECA Wet Chemistry Lab (WCL) |
Raw time series |
MECA Miscellaneous (Misc) |
All data sets |
MECA Optical Microscope (OM) |
All data sets |
MET Light Detection and Ranging (LIDAR) |
All data sets |
MET Pressure and
Temperature (PT) |
All data sets |
Robotic Arm Camera (RAC) |
All data sets |
Surface Stereo Imager (SSI) |
Raw images, operations higher level products, science
radiometrically calibrated images |
Thermal and Evolved Gas Analyzer (TEGA) |
All data sets |
Data in the Notebook, accessible from the Resources tab |
|
|
INSTRUMENT |
DATA SET |
|
|
Atmospheric Structure Experiment (ASE) |
Time series of raw accelerometer data |
|
|
Surface Stereo Imager (SSI) |
Atmospheric opacity |
|
|
Telltale |
Wind velocity |
Data not in the Notebook |
|
|
INSTRUMENT |
DATA SET |
AVAILABILITY |
Atmospheric Structure Experiment (ASE) |
Atmospheric profiles |
Scheduled for release 3 |
MECA Atomic Force Microscope (AFM) |
Derived data sets |
Available from
PDS Geosciences Node |
MECA Thermal and
Electrical Conductivity Probe (TECP) |
Derived data sets |
Scheduled for release 3 |
MECA Wet Chemistry Lab (WCL) |
Derived concentration time series |
Available from
PDS Geosciences Node |
Robotic Arm |
Raw data |
Not available due to ITAR restrictions |
Robotic Arm |
Derived data sets |
Scheduled for release 3 |
Surface Stereo Imager (SSI) |
Science radiometrically calibrated images (I over F) |
Scheduled for release 3 |
Calibration Reports / Software Interface
Specifications
All calibration reports and the MET and TEGA Software
Interface Specification (SIS) documents are currently under ITAR
clearance review. An approved version of these documents is
expected to be part of release 2 (Feb 22, 2009).
Features and Targets
The sol summaries contain a list of features and targets
defined by the science team that were available for use on a
given sol. Not every feature or target listed was used.
Daily activity plans will be included not later than release
3 of the
Notebook (April 29, 2009) showing activities, targets, features,
and related products.
Coordinated Observations
The Phoenix and Mars Reconnaissance Orbiter (MRO) missions
carried out a series of coordinated observations. The MRO data
from coordinated observations within the first 90 sols have not
been released at this time. Coordinated observation listings
will be included in concert with the MRO data release on March
9, 2009. |